Beck Street Extension, City of Bryan, Texas.


In order for the City of Bryan to extend an existing street to alleviate traffic congestion, HHR was retained to ensure compliance with NFIP regulations.  We provided hydrology and hydraulics design for four bridge-class culvert crossings on Cottonwood Branch and two stormwater management facilities.  We prepared the CLOMR and LOMR based on as-built conditions.  Related services included preparation of PS&E for drainage improvements.  This effort required coordination with FEMA review contractor, City of Bryan, surveyor, and general contractor.

 

 
<
>
 
Stormwater Management Facility under construction