Precinct Line Rd. at Walker Branch, Fort Worth, Texas


Texas DOT and the City of Fort Worth collaborated on this project to replace the bridge, elevate the approaches above the base flood, and channelize a portion of the natural channel.  HHR prepared hydrology and hydraulics analysis of proposed improvements.  Our services also included mitigation analysis of alternatives, drainage-related construction plan sheets, and CLOMR preparation for FEMA review.  We coordinated with City FPA, TxDOT, and FEMA’s review contractor.

 

 
<
>
 
Existing Bridge at Precinct Line Road